Track litres of water per litre of product continuously — not just as a month-end average.
2 of our 19 case studies are in this sector.
What we found in factories like these.
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A transfer line's flow signature drifted, the alert fired, and the diaphragm was replaced on a schedule instead of during a shutdown.
Scheduledreplacement
WaterBreweries & BeverageFood & Beverage Processing
Sub-metering a brewery, and taking more than 100,000 m³ off its water use
Carlsberg Canada
Between 2023 and 2024 water use at the Carlsberg Canada brewery fell by more than 100,000 m³, and the Region of Waterloo gave the site its 2024 Water Efficiency Excellence Award for it.
100,000 m³2023 to 2024
See what these numbers look like in your factory.
Bring us a shift and a stack of bills. We will walk the floor with your team, point at what is worth metering first, and put a figure beside it.
Book a site visitRun the numbers