Case studies
Predictive maintenance case studies
3 of our 19 case studies are about predictive maintenance.
What we found.
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A transfer line's flow signature drifted, the alert fired, and the diaphragm was replaced on a schedule instead of during a shutdown.
Scheduledreplacement
Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: Automotive, Plastics & Rubber
Conveyor-drive bearing degradation detected six weeks before failure
A bulk handling facility
The bearing’s vibration signature began changing approximately six weeks before the projected failure point.
6 weeksof warning
Predictive maintenanceMunicipal & Public Utilities
Pump cavitation caught three weeks early
A municipal water facility
The vibration signature changed about three weeks before anyone would have heard it.
3 weeksof warning
Run the same numbers on your own factory.
The estimator on our ROI page reads your own bills against our published benchmarks and gives you a sense of what is probably hiding in yours. It takes about a minute.
Book a site visitRun the numbers
or call 1-833-QUANTFY (1-833-782-6839)
