Case study
More than $150,000 a year, taken out on the dashboard data
Compressed airWaterFood & Beverage ProcessingBulk Handling & Rail Logistics
Metering PDI Bulk's water and compressed air showed where both were going, and within weeks the general manager had taken more than $150,000 a year out of operating costs on process adjustments alone.
PDI Bulk

How it went.
Every study on this site runs the same four beats, in the same order.
01
Alert
Overnight water flow nobody could see, and a compressor cycling constantly to hold pressure in a leaking system.
02
Cost
$150,000 per year. Reduced by the client, on process adjustments made from the dashboard data, within weeks of it going live.
03
Fix
Water metering on the incoming service and major consumers · Compressed-air header pressure and compressor runtime monitoring · Railcar temperature monitoring for in-transit QA/QC · Alerting on overnight baseline flow
04
Restored
Overnight flow stopped; compressor runtime down and header pressure stable
In full.
The problem
Two problems, one plant. Water was leaving the building overnight, and the air compressor was working far harder than the demand justified.
“At PDI, the compressor was running harder than it should have been — cycling constantly to maintain pressure in a system that was losing significant volume to undetected leaks…”
What we installed
Metering on the incoming water service and the major consumers, header pressure and runtime monitoring on the compressed-air system, and railcar temperature monitoring for in-transit QA/QC.
What the data showed
The first night of metering answered the water question on its own. Water was running out of the building while nobody was in it, which is a thing a monthly invoice can never show and a thing an overnight baseline shows immediately. The leaks were found and the process was changed.
What changed
“We identified the losses, worked with the team to address them, and then watched what happened. The compressor runtime dropped. The pressure stabilized.”
The number
More than $150,000 a year, on process adjustments alone. Jeff Inkes, PDI Bulk’s general manager, published that figure himself in a Google review of our work: “Within weeks of having the dashboard, I’ve been able to reduce annualized operating costs more than $150,000 by simply making process adjustments based on the data collected.”
Also true
The work became a national rollout across facilities in Ontario, Alberta and Quebec.
What the data looked like.
Hover or arrow-key across the trace to read any interval. The flagged point is the one that started the conversation.
| Interval | Incoming service (L/min) |
|---|---|
| 00:00 | 9 |
| 00:30 | 8 |
| 01:00 | 9 |
| 01:30 | 10 |
| 02:00 | 10 |
| 02:30 | 8 |
| 03:00 | 9 |
| 03:30 | 10 |
| 04:00 | 10 |
| 04:30 | 9 |
| 05:00 | 10 |
| 05:30 | 9 |
| 06:00 | 44 |
| 06:30 | 46 |
| 07:00 | 48 |
| 07:30 | 51 |
| 08:00 | 53 |
| 08:30 | 52 |
| 09:00 | 53 |
| 09:30 | 53 |
| 10:00 | 51 |
| 10:30 | 51 |
| 11:00 | 48 |
| 11:30 | 48 |
| 12:00 | 45 |
| 12:30 | 43 |
| 13:00 | 41 |
| 13:30 | 40 |
| 14:00 | 38 |
| 14:30 | 36 |
| 15:00 | 35 |
| 15:30 | 36 |
| 16:00 | 35 |
| 16:30 | 37 |
| 17:00 | 37 |
| 17:30 | 40 |
| 18:00 | 9 |
| 18:30 | 9 |
| 19:00 | 10 |
| 19:30 | 8 |
| 20:00 | 8 |
| 20:30 | 9 |
| 21:00 | 9 |
| 21:30 | 10 |
| 22:00 | 9 |
| 22:30 | 10 |
| 23:00 | 9 |
| 23:30 | 10 |
| Before | Overnight flow running unseen; the compressor cycling constantly to maintain pressure |
|---|---|
| After | Overnight flow stopped; compressor runtime down and header pressure stable |
The published totals are the figures in the proof register, with their sources. The interval shape is a representative reconstruction and is flagged as such in the dataset.
What changed.
Before
Overnight flow running unseen; the compressor cycling constantly to maintain pressure
After
Overnight flow stopped; compressor runtime down and header pressure stable
$150,000
per year
Reduced by the client, on process adjustments made from the dashboard data, within weeks of it going live.
Source: Jeff Inkes, General Manager, PDI Bulk, in a Google review of Quantify Environmental
In their words.
Within weeks of having the dashboard, I've been able to reduce annualized operating costs more than $150,000 by simply making process adjustments based on the data collected.
Jeff Inkes, General Manager, PDI Bulk
Quoted verbatim from the archive. Where only a fragment is on file it renders as a fragment with its attribution; the middle is never invented.
Where to go next.
The sector, the sibling studies, and the calculator that runs this same arithmetic on your own numbers.
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A transfer line's flow signature drifted, the alert fired, and the diaphragm was replaced on a schedule instead of during a shutdown.
Scheduledreplacement
WaterBreweries & BeverageFood & Beverage Processing
Sub-metering a brewery, and taking more than 100,000 m³ off its water use
Carlsberg Canada
Between 2023 and 2024 water use at the Carlsberg Canada brewery fell by more than 100,000 m³, and the Region of Waterloo gave the site its 2024 Water Efficiency Excellence Award for it.
100,000 m³2023 to 2024
Compressed airManufacturing: Automotive, Plastics & RubberMetal Fabrication & Finishing
Compressed air leaks in a stamping operation
A Tier 2 automotive stamping factory
Permanent monitoring revealed compressed air continuing to flow into an otherwise idle building overnight.
20–30%of compressor output
Find out what’s hiding in your factory.
Every study on this site started with somebody walking a floor and asking what the numbers actually were. Our team will do the same on yours and tell you honestly what we find.
Book a site visitAll case studies
or call 1-833-QUANTFY (1-833-782-6839)